NAVAIR 00 80T 109 PDF

15 Jun NAVAIR T INTERIM CHANGE SUMMARY. The following Interim Changes have been cancelled or previously incorporated into this. 3 Sep aircraft refueling natops manual pdf. Read and Download PDF Ebook aircraft refueling natops manual navair 00 80t at Online Ebook. aircraft refueling natops manual navair 00 80t design manual for roads and bridges highway structures v 1 aircraft refueling natops manual navair 00 80t.

Author: Tygojora Sashura
Country: Republic of Macedonia
Language: English (Spanish)
Genre: Politics
Published (Last): 15 July 2014
Pages: 390
PDF File Size: 9.51 Mb
ePub File Size: 11.13 Mb
ISBN: 854-5-79393-161-5
Downloads: 85269
Price: Free* [*Free Regsitration Required]
Uploader: Akirg

The act navair t providing an electrical connection between an object e. Trainees may operate the system, but only under the direct supervision of a qualified operator.

To prevent or eliminate sources of ignition, activities shall: Aircraft Refueling Equipment Checklists.

The station operator must remain in position at controls throughout the entire fueling operation. All military and contract revealers shall have the following minimum requirements: Verify that manned firefighting equipment is in the area. Never wash hands with gasoline or jet engine fuels. Closed circuit refueling — nozzle and receptacle system used navair t US Army helicopters. Naval Facilities Engineering Command. All refueling equipment shall be clearly marked navair t the appropriate NATO Code Number contained in a rectangle as well as the common U.

Keep refueler tanks filled when not in use or when no defueling is anticipated. Verify that navair t maintenance requirements for transfer cart and components navair t current. If the product is clear and bright in appearance the flow will continue. Fuel stored for long periods of time shall be sampled and fully tested in accordance with the applicable navair t each 6 months for turbine fuels and navair t 6 months for aviation gasoline.

TOP Related  FUMEFX TUTORIAL EBOOK

They shall never be used to inert a fuel navair t Laboratories shall also note the presence of significant amounts of free water in the bottom of navair t sample container. Classification of sample and tests required see paragraph 3. Flushing shall be continued navair t tt results are consistent or results indicate compliance with navair t use limit requirements.

Aircraft Handling t 3. When hose is evacuated, disconnect nozzle from the aircraft adapter, navair t adapter cap, and remove ground wire from aircraft, then deck.

aircraft refueling natops manual navair 00 80t

SPR aircraft refueling nozzle with straight body and a hose end pressure regulator. This instrument is used to determine the free-water content of aviation fuels. The receiving tank will be segregated until further sampling and testing can be accomplished.

If the product is clear and t in appearance and the API gravity is within 0. When fueling or defueling aircraft, a PQS qualified member of the Aviation Fuels Division shall be present to ensure all operations are conducted per applicable instructions. Each activity that refuels aircraft shall have a designated laboratory where in-house inspections and tests can be performed in a clean, safe environment.

Meters used for service such as fueling aircraft, motor vehicles or boats, or for loading navair t trucks or tank cars, shall be navaie displacement meters. Turbine meters may be used for larger volume steadystate transfers such as loading ships, barges, or pipeline transfers. This does not prohibit overwing refueling of aircraft that are solely configured for this navair t Use only footwear that completely covers the feet in order to navxir protection against fuel spills and fires.

TOP Related  DURGASOFT SCJP MATERIAL PDF

Compliance with the stipulated manual requirements and procedures is mandatory except as authorized herein. Amphibious transport dock ship.

NAVAIR 00-80T-109 EPUB

Fuel Dispensed to Aircraft by Ships. The navair t procedures and precautions shall be included in the local regulations and procedures: Runkop Club do you know where to read pdf files online?

Each single point refueling SPR nozzle assembly shall include a hose end pressure regulator set for a maximum of 55 psi. Employ the buddy system when entering deep unvented or poorly vented pits; i. During the fuel transfer operation, take fuel samples as t Navair t departure from the procedures of this chapter may navair t effect the overall safety of the operation being performed. Glass sample bottles for shipment to shore laboratories shall be filled to 1 inch below the cap. Navair t employees performing fuel duties shall be company trained and certified.

Good ventilation of work spaces is essential. Flushing shall be accomplished daily when underway. Presence of flammable or explosive vapors. The development of navair t and efficient fuel handling and aircraft refueling procedures is a continuously evolving process.